Clients list
Some of our finished and ongoing projects since 1993 in Thailand
| Start - Finish |
Project name and description |
Client |
| Feb 2002 - |
Equipment support for press machine
Engineering and construction works. We are the main contractors for all equipment support for the
press machines of 400 ton, 500 ton and 600 ton; welding bay, and utilities supply.
|
AAPICO Hitech Co., Ltd. |
| June 2001 - Sep 2001 |
Equipment and Utilities Supply
Engineering and construction works. We are the main contractors for all equipment installation and utilities supply.
|
Delphi Automotive (Thailand) Limited.
|
| Sep 2000 - Oct 2001 |
4'' NGL Pipeline Project
We do Engineering, design and construction management for piping, civil structure, pumping, electrical and
instrument works.
|
Air Liquid (Thailand) Co., Ltd. |
| Nov 2000 - |
POPIT & HVPU Project
We do engineering design and consultant works on the construction. Engineering and design finished
in April 2001, and consultation on the construction is ongoing.
|
National Starch & Chemical (Thailand) Limited. |
| Mar 1997 - July 1997 |
ROC Ethylene Project
Sub-contract work on structural steel fabrication and erection, pipine fabrication and erection.
Also preparation of detailed drawing on approximately 2000 tons of steel works.
|
Taisei Corporation |
| May 1995 - Oct 1995 |
CAPROLACTAM Project, TPE
Sub-contract on approximately 600 tons (or 30% of all) structural fabrication and erection.
Also preparation of detailed drawing on 1000 tons of steel works.
|
Toyo - Thai Engineering |
| Feb 1995 - Sep 1995 |
SPRC Jetty Piping Project
Sub-contract on the construction works.
|
Italian - Thai Development Co., Ltd. |
| Feb 1995 - Sep 1995 |
Pilot Project
A turnkey project in which we do all engineering drawings from process flow diagrams provided by the client.
We provide detailed drawings, procurement service, construction, and commissioning.
|
Thai Poly Ethylene |
| Mar 1994 - Aug 1995 |
ABB LUMMUS Reformer Furnace Project
We provide engineering details and QA/QC packages including all paper works, personnel, inspectors,
procurement, fabrication, erection, hydro-test, test run, and engineering stamps to operate the furnace boiler.
|
Thai Poly Ethylene |
Some of the projects in which we have partial work
| Period |
Client - Project |
Type of work |
Value (M Baht) |
| Jan 2004 - Aug 2004 |
CCS, Utaitani Chockechai Starch |
Engineering design, fast track and construction management.
Plant expansion from 200 tons/day to 400 tons/day |
130 |
| Oct 2003 - |
SWS, Nakornratsima Sangounwongse Starch, Inc. |
Engineering design, construction management for the plant expansion from
250 tons/day to 550 tons/day.
Includes plant layout, civil design, mechanical, electrical, instrumentation, equipment selection, etc.
|
280 |
| Going on |
Kaeng Khoi Cogeneration Plant Process Steam Piping Installation Project Line 3,
Kaeng Khoi, Saraburi |
Civil design, piping and construction |
5.2 |
| Jul 2002 - 10 Mar 2003
| 4" NGL pipeline from Bayer to PTT, Maptaput, Rayong |
Engineering works for civil, mechanical, control, instrumentation and construction management.
9.8 km on TOC and ROC pipe rack |
|
| Aug 2003 - Sep 2003 |
Pipe Rack, Eastern Fluid Transport Co., Ltd. Maptaput, Rayong |
Detailed design drawings, shop drawings, fabrication, assembly and installation |
1.2 |
| May 2003 - Aug 2003 |
Pipe bridge 80 ton 1 set, Asia Industrial Estate, Maptaput, Rayong |
Detailed design drawings, shop drawings, fabrication, assembly and installation |
4.5 |
| - Oct 2003 |
Phelps Dodge Thailand Limited |
85 Cabling and car parking project construction work. Civil and arch work, steel structure |
5.0 |
| Completed |
PQ Chemical Thailand Co., Ltd. |
Water tank 100200 Cubic meters. Foundation and steel tank design, site supervision |
1.5 |
| Feb 2002 - Jul 2002 |
Appico Hitech co.,Ltd. Hitech Industrial Bangprain Ayutthaya |
Equipment supply for press machine (400 tons, 500 tons, 600 tons).
Design, structural steel fabrication and erection.
Welding bay for assemblies. Design, structural steel fabrication and erection.
Construction office extension. Structural design, fabrication and erection, architect design, construction, electrical
and communication.
|
5.2 |
| On going |
Talad Tai pratumtani |
Design and construction of warehouse, building, parking, road and drainage system |
10.5 |
| - Nov 2002 |
Toyo Thai Engineering Co., Ltd. |
Power Plant. Construction, drainage system and piping work |
3.0 |
| Completed |
Air Liquid (Thailand) Limited. 4" NGL Pipe line project, Maptaphut, Rayong |
4" NGL Pipeline, 7.5 km with pump facilities (PTT area). Engineering design and
construction management |
8.5 |
| - May 2002 |
National Starch & Chemical (Thailand) Limited.
Popit/Hvpu project |
High quality flour factory design and construction management. Engineering and design, electrical and instrument |
273.1 |
| - May 2001 |
Laem Chabang Power Plant, Cholburi |
Piping design: steam system |
54.5 |
| - Dec 2000 |
PTT Oil Depot, Saraburi, Pratumtani |
Commissioning project: mechanical, electrical, instrumentation |
22.4 |
| - Nov 2000 |
Tanyapol Power Plant, Chainart |
Boiler and turbine package |
18.1 |
| - Oct 2000 |
PTTEP |
Sub-contractor for Italian-Thai Development. FSO Piping work for condensate gas system,
partition beam and built-up beam for off-shore work |
4.5 |
| - Sep 2000 |
Bowin Power Co., Ltd. |
Sub-contractor for Italian-Thai Development. Engineering assistance for interconnecting pipeline
design work |
1.8 |
| - Jul 1999 |
Thai Olefin Company, Rayong |
Unsat C3/Mixed C4 Pipine system. EPC contract |
7.6 |
| - Apr 1999 |
PTT Oil Depot, Lumlukka, Pratumtani |
Commissioning project: mechanical, electrical, instrumentation |
15.6 |
| - Feb 1999 |
TOC Rayong |
Pipe stress analysis for Ethylene piping modifications |
1.3 |
| - Jan 1999 |
NPC Rayong |
Piping design, pipe stress analysis for liquid ethylene for export. Tie-in work with TOC |
1.9 |
| - Dec 1998 |
Talad Thai Patumtani |
Water storage tank, orange market structural work including materials and labour |
26.3 |
| - Dec 1997 |
RPC Rayong |
Joint Venture Flang Engineering Company equipment installation |
6.5 |
| - Dec 1997 |
Asahi Float Glass Plant, Rayong |
Sub-contractor for Ital-Thai Engineering Co. Mechanical package: piping, duct work, commissioning |
15.7 |
| - Aug 1997 |
Alpha Memory Project, Chachoensao |
Oil storage tank, water tank, LPG tank, civil and mechanical, electrical and controls |
9.5 |
| - Jan 1997 |
Carlsberg Brewery Bang Barn, Ayutthaya |
S.S.Fermentation tanks, 8 tanks, mechanical package only |
18.6 |
| - Nov 1996 |
Carpolactum , TPI |
Process area structural work |
13.5 |
| - Sep 1996 |
Rayong Refinery Company, Maptaphut, Rayong |
Steam Methane Reformer Furnace, unit 303 A,B.
Main contractor = ABB Lummus
Civil and mechanical works |
35.2 |
| - June 1996 |
Ryoka Factory, Rojana Industrial Estate |
Mold Injection System. Mechanical package: equipment, piping foundation |
8.3 |
| - Nov 1995 |
Siam Chemical Co., Ltd.
Prapadaeng, Samutprakarn |
2 Storage tanks with pumping facilities |
15.6 |
--------------------------------------------------
|
|